Email Archives for February, 2003 by subject
- (no subject)
- [Fwd: Summary: Dealer for HF cables]
- absolute integration of 1D spectra in array with vnmr
- Air turn over monitor
- AMMRL at ENC
- answers to my question: ZQC
- Assoc. Manager/Postdoc
- Building Design Question
- calculation of J-couplings from geometries
- Configuration of Inova for Protein NMR
- CPMAS on Bruker Avance liquids console
- CPMAS on Bruker AVANCE liquids console summary
- cryoprobes in routine use
- Dealer for HF cables
- ENC roommate?
- instrumentation
- insturmentation
- JEOL survey
- JEOL, Bruker
- Liq. N2 Dolly
- Looking for a RF Control Board
- NMR manager position at Vanderbilt University
- NMR newsletter
- NMR Newsletter - update
- oscilloscopes
- Position Available at The Burnham Institute
- posting of replys
- Question regarding plotting from SGI
- scheduling software --> PC with limitations
- SGI/Linux NFS
- solid <=> solution summary
- spectra assignment
- Spin Simulation Software
- spinner for a widebore?
- standards for 129Xe and 15N
- Strange behavior of spinning sensor
- Summary - J couplings from Geometries
- Summary: Dealer for HF cables
- summary: JEOL survey
- Summary: Specific Q's about UPS
- survey
- Synthesis of CDCl3
- UMMS postdoc position
- UNIX book
- used BBI probehead
- used probehead-continued
- Varian Inova 500 sidebands
- wide vs. narrow bore
- Windows or Linux for XWINNMR
- Last message date: Fri Feb 28 2003 - 15:18:00 MST
- Archived on: Wed Jun 07 2023 - 14:24:20 MST